Briefing on Retrospective Delay Analysis

January 2005

Retrospective Delay Analysis in Construction Contracts
The many different methods of retrospective delay analysis can be divided into 3 groups: Non-critical path; static critical path; dynamic critical path. The 2 predominant areas are static and dynamic. Static critical path analysis is largely inferior to a dynamic critical path analysis and is usually adopted when […]